03 · Residential · Gujarat, India

A three-storey residence, coordinated across three disciplines

Architecture at LOD 400 with real wall build-ups, preliminary structure and plumbing, linked into one federated model under a written BEP. 31 sheets over four issue rounds, and rule-based clash checks took hard clashes from 19 to 0 before issue.

Scope
Architecture · Structure · Plumbing
Deliverables
ARC · STR · MEP linked RVT · IFC · 31 sheets · BEP
Year
2026
LOD 400ARC + STR + MEPClash detectionWritten BEP
A three-storey residence, coordinated across three disciplines
LOD 400
Architecture, real wall build-ups
3
Models, linked + IFC
31
Sheets: plans, sections, details
19 → 0
Hard clashes before issue
30,000+
Drawing lines read by our AI
9%
Scale error caught before modelling

01 · Walkthrough

The model, end to end.

Architecture, structure and plumbing, federated and coordinated, from the street front to the kitchen to the drainage stack.

Model walkthrough · ARC + STR + MEP

02 · Three disciplines

Architecture, structure and plumbing, linked.

Three models linked and exported to IFC: architecture at LOD 400, preliminary structure, and plumbing at LOD 300, checked against each other with rule-based clash checks before every issue.

Architecture · LOD 400
Architecture · LOD 400
Preliminary structure
Preliminary structure
ARC + STR federated
ARC + STR federated
Plumbing · LOD 300
Plumbing · LOD 300
Rear view · balconies & services
Rear view · balconies & services

03 · Detailing

Detailing at LOD 400.

Furnished kitchens and toilets with real wall build-ups, sections through the stair, and every coordination item resolved before issue. The AI read caught a 9% scale error in the source drawings and verified 75 dimensions against the CAD.

75
Dimensions verified against the CAD
4
Issue rounds
Kitchen · LOD 400
Kitchen · LOD 400
Toilet · LOD 400
Toilet · LOD 400
Section A-A through the stair
Section A-A through the stair
Clash item: landing beam over a window lintel, resolved before issue
Clash item: landing beam over a window lintel, resolved before issue

Next step

Send us one package.

A live package your team would spend two to three weeks on. A checked Revit model back in 24–48 hours.

Start a pilot

Next case study

Repetitive Revit work, automated

Revit automation →